Dunedin Airport Baggage Hall Extension Dunedin International Airport

Baggage Hall Extension at Dunedin International Airport

 Complete electrical fit out as per electrical design, including:

  • Disconnect existing handlers office
  • Install new exterior lighting
  • Relocate overhead heaters
  • Connect new roller doors
  • Wire out new AVSEC offices
  • Fit new light fittings in baggage hall
  • Disconnect existing AVSEC offices
  • Wire and connect security gate
  • Switchboards
  • Connect new loaders portacom
  • Install PA System
  • Mechanical Electrical Services
  • Install 3 Heatpumps
  • Install 2 air supply fans
  • Install fan in baggage hall
Back to Commercial/ industrial